2024 Mill and Overlay Project

2024 Mill & Overlay

Preparation of a feasibility report for the project is underway. Work is proposed to take place in various areas of the city.
  • Terracon has gathered pavement “cores” to verify the existing pavement and gravel base thickness.
  • Hydro-Vac, Inc. has been authorized to begin televising the sanitary and storm sewer pipes to document the pipe conditions.
Updated: Nov. 6